News

Facts & Figures


Pipeline

  • Mainline:  737 miles long; 36-inch diameter, 1,480 psi maximum operating pressure
  • Fairbanks Lateral: 35 miles long; 12-inch diameter (tie-in with mainline at MP 458)

Gas Conditioning Facility

  • A 70-acre site at Prudhoe Bay will be constructed to remove carbon dioxide, hydrogen sulfide, and other impurities from the gas.