News
-
March 15, 2012
The Alaska Gasline Development Corporation announces the…
-
The Alaska Gasline Development Corporation announced that the Alaska Stand…
-
The Alaska Gasline Development Corporation announces the ASAP Draft Environmental…
-
The Alaska Gasline Development Corporation (AGDC) announces their office relocation…
-
NOTICE OF MEETINGĀ ALASKA GASLINE DEVELOPMENT CORPORATIONĀ BOARD OF DIRECTORS
The Alaska…
Facts & Figures
Pipeline
- Mainline: 737 miles long; 24-inch diameter; 2,500 psi maximum operating pressure
- Fairbanks Lateral: 35 miles long; 12-inch diameter (tie-in with mainline at MP 458)
Gas Conditioning Facility
- A 70-acre site at Prudhoe Bay will be constructed to remove carbon dioxide, hydrogen sulfide, and other impurities from the gas.
Compressor Stations
- Two stations are required for initial flow of 250 to 500 million standard cubic feet/day
- Gas-turbine-driven centrifugal compressors (electrical units will be evaluated if air quality issues arise)
- Two gas-turbine-driven electric power generators housed in metal buildings with pile-foundations will be constructed on separate gravel pads
Other Permanent Facilities
- An NGL extraction plant near Port MacKenzie
- A gas take-off facility near Dunbar